6701 Shellmound Street ("Nady Site")


​Project Description
The City is currently
processing an application by Anton Development Company for a Conditional Use Permit and Design Review to demolish two existing office and warehouse buildings and to construct a new residential building. A total of 211 residential units are proposed for the site in a single five-level wood-frame building situated on a podium over a two-story parking garage. The unit mix includes: 11 studios, 94 one-bedrooms, 85 two-bedrooms, and 21 three-bedrooms. The project also includes a fitness room, dog spa, bike spa, garden, common areas, and a landscaped roof deck. The south entry and exit onto Shellmound Street provides vehicle access to the site through the parking garage and loading area. The two levels of parking provided within the building—at-grade and on the second floor—provide 264 parking spaces. A total of 225 bicycle parking stalls are also provided.

Study Sessions and Public Hearings

- The Planning Commission held a study session on December 12, 2013. Click here for the staff report and plans.
- The Planning Commission held a second study session on March 24, 2014. Click here for the staff report and plans.

At this time no public hearing has been schedule for project approval/denial. 

CEQA Review

An Environmental Impact Report (EIR) has been prepared for the project under the California Environmental Quality Act (CEQA). A Notice of Availability was issued on November 4, 2015 with the 45-day comment period ending on December 21, 2015.

For a copy of the Draft EIR, click here.

For a copy of the documents reference in the Draft EIR, click here.
      The above link includes all references except the following:
      PES 2014a Phase I
      PES Environmental, Inc., 2015a Conceptual Site Model
      PES Environmental, Inc., 2015b Site Mitigation and Contingency Plan

Response to Comments (RTC) document has been prepared for the project under the California Environmental Quality Act (CEQA). A Notice of Availability of the Responses to Comments and Final Environmental Impact Report was issued on March 10, 2016.

For a copy of the RTC document, click here.

The City of Emeryville Planning Commission will hold a public hearing to consider certification of the Final Environmental Impact Report and approval of the Use Permit and Design Review for the project on Thursday, March 24, 2016 at 6:30 p.m. at City Council Chambers, located at 1333 Park Avenue.